Varanasi to get 89-km elevated corridors along Rivers Ganga and Varuna to boost connectivity

Wait 5 sec.

Elevated corridors in Varanasi: Varanasi in Uttar Pradesh is set to get two major elevated corridor projects along the Rivers Ganga and Varuna to ease traffic congestion and improve connectivity to key religious, cultural, and transport hubs. With a combined length of around 89.2 km, the two corridors will connect NH-31 with the Varanasi Ring Road along the River Varuna and NH-19 with the Ring Road along the River Ganga. The projects will be developed by the National Highways Authority of India (NHAI).In a statement on Friday, the NHAI said the two projects received an encouraging response from bidders. Both corridors will be developed in two packages each. The Varuna Elevated Corridor received eight bids for Package I and seven for Package II, while the Ganga Elevated Corridor received eight bids for Package I and nine for Package II. Together, the four packages attracted a total of 32 bids. The projects were approved by the Cabinet Committee on Economic Affairs (CCEA) in July 2026.Varanasi’s Varuna elevated corridor to cut travel time to Kashi Railway StationThe 43.2-km-long elevated corridor along River Varuna is expected to reduce travel time between NH-31 and Kashi Railway Station from around 40 minutes to 20 minutes. It will connect NH-31 with the Varanasi Ring Road and will be developed in two packages under the Hybrid Annuity Model (HAM), with a total capital cost of Rs 10,998.32 crore. The project will comprise an elevated 6/4-lane corridor, including the main carriageway, flyovers, loops, ramps and service roads.The corridor will also improve access to Varanasi Airport, Varanasi City Railway Station, Varanasi Junction, Deen Dayal Upadhyaya Junction, Ramnagar Port, Sampurnanand Sanskrit University and the city’s famous ghats. It will also improve connectivity to the adjoining Chandauli region.Designed for an operating speed of 80-100 kmph, the project will reduce vehicle operating costs and facilitate faster movement of passenger and freight traffic.The corridor will also strengthen regional connectivity by improving access to Chandauli’s economic and social nodes and six major logistics nodes. In line with the PM Gati Shakti National Master Plan, it is expected to enhance multimodal integration, facilitate the movement of agricultural produce, industrial goods, construction materials and minerals, and support economic growth across eastern Uttar Pradesh.Varanasi’s Ganga elevated corridor to cut travel time from 60 to 20 minutesThe 46-km-long elevated corridor along the River Ganga is expected to reduce average travel time from around 60 minutes to just 20 minutes. The six-lane Ganga Elevated Corridor will connect NH-19 with the Varanasi Ring Road, providing high-speed, access-controlled connectivity along the Ganga riverfront. The project will be developed in two packages under the Hybrid Annuity Model (HAM), with a total capital cost of Rs 14,447.64 crore.Story continues below this adThe project will include a six-lane elevated main carriageway, a 910-metre cable-stayed bridge, a 1.32-km extradosed Foot Over Bridge-cum-Major Bridge, loops, ramps, link roads and service roads. Designed for an operating speed of 80-100 kmph, the corridor will significantly reduce travel time across key routes in the region. The journey between NH-19 and Kashi Railway Station is also expected to become faster, with travel time falling from around 50 minutes to 25 minutes.The corridor will also provide improved access to major highways, railway stations, Lal Bahadur Shastri Airport and Ramnagar Inland Waterways Authority of India (IWAI) Port. It will also strengthen connectivity to important religious, educational and cultural destinations, including Kashi Vishwanath Temple, Banaras Hindu University (BHU), Namo Ghat, Ramnagar Fort and the ghats of Varanasi.