HMWS&SB plans 10-km pipeline network to boost city’s water supply

Wait 5 sec.

HMWS&SB plans 10-km pipeline network to boost city’s water supply - The HinduPublished - November 28, 2026 08:40 pm IST - HYDERABADThe Hyderabad Metropolitan Water Supply and Sewerage Board (HMWSSB) is planning to draw an additional 21 million gallons per day (MGD) of drinking water from Osmansagar, and treat it at a proposed water treatment plant at Shaikpet filter beds, to meet the city’s future demand.As part of the plan, Managing Director of HMWS&SB K. Ashok Reddy and HGCL Managing Director Upender Reddy on Saturday inspected the proposed 120-feet road between MGIT and Puppalaguda BRC to assess the feasibility of laying two major drinking water pipelines, measuring 1,200 mm and 1,300 mm in diameter.The officials walked nearly six kilometres along the proposed alignment, identifying constraints such as road crossings, land acquisition, utility lines, structural obstructions and pending permissions. They also discussed preparing a comprehensive design for laying 10 kilometres of pipelines, with instructions to coordinate the work with the road expansion project and avoid repeated excavation.Officials were asked to examine the possibility of laying pipelines along existing conduits or bunds, as well as placing new lines parallel to existing ones wherever feasible. The assessment will also cover railway crossings, tunnelling requirements, forest clearances and other permissions.With summer approaching, Mr. Reddy stressed that the work should not damage existing pipelines or disrupt drinking water supply. Officials were asked to take precautions during excavation and consider postponing work that could affect supply until after the rainy season, if required.The proposed 21 MGD treatment plant at Shaikpet is intended to process additional water drawn from Osmansagar and supply it to nearby areas. Officials were directed to ensure that the road and pipeline projects are planned together and completed within the stipulated timelines without compromising quality or safety.Jalmandali Technical Director Prabhu, CGM Balarama Raju, GMs Santhosh and Narahari, HGCL chief engineer Venkateswarlu and other officials participated in the inspection.Published - November 28, 2026 08:40 pm ISTSign in to unlock member-only benefits!Access 10 free stories every monthSave stories to read laterAccess to comment on every storySign-up/manage your newsletter subscriptions with a single clickGet notified by email for early access to discounts & offers on our products${ ind + 1 } ${ device }Last active - ${ la }