Rock Tech Lithium Announces Total Capital Costs of Approximately CAD$600 Million for Red Rock Converter based on Preliminary DFS Results

Wait 5 sec.

Preliminary results of the Definitive Feasibility Study ("Preliminary DFS Results") for the Red Rock converter in Ontario indicate total capital costs of approximately CAD$600 million. Preliminary DFS Results are based on a further optimized, industry-proven converter design with an...