Following opposition from citizens, the Karnataka government has dropped plans to acquire around six acres inside Lalbagh, the famed botanical garden, for a twin-tunnel project connecting north and south Bengaluru, and has identified two alternative routes.Greater Bengaluru Development Minister Krishna Byre Gowda on Wednesday said the government remains committed to changing the alignment to keep it away from Lalbagh.The 16.75-km north-south tunnel road project in Bengaluru proposes to connect the Hebbal and Silk Board junctions through twin tunnel tubes. It will be executed in two packages: the first covers the Esteem Mall-Hebbal–Seshadri Road stretch, and the second covers the Seshadri Road–St John’s Hospital, Madiwala stretch.Gowda said that, in line with a Cabinet decision, a committee headed by the chief secretary has been formed to negotiate and reduce the cost, comprising finance and Public Works Department (PWD) officials, and has already held a couple of meetings.Also Read | ‘Lalbagh is not a pizza’: Bengaluru residents rally against 5% park land rule“A survey is underway, and a couple of locations have been identified; the pros and cons are being discussed at this stage. Two locations have been identified, and one will eventually be decided. We will finalise and reveal it. The work order will be issued after the completion of the cost negotiation,” Gowda said, adding that the work order would come later.He noted that construction costs would rise because of the increased length. “Earlier (the Lalbagh alignment) was of optimum length, but now it will increase. After the new alignment, a discussion will be held on cost sharing and only then will the works start,” he said.Gowda said the government’s contribution to the project is fixed at Rs 7,000 crore. Asked whether toll rates would rise due to the revised alignment, he said toll charges would follow National Highways Authority of India (NHAI) pricing norms, but added that the longer distance would extend the toll collection period.Win for citizens: Tejasvi SuryaStory continues below this adReacting to Gowda’s statement, Bengaluru South MP Tejasvi Surya said it is a victory for the citizens of Bengaluru who came out in large numbers to oppose the project.“Changing the alignment does not make the project scientific. Experts from IISc and other institutions have warned that it will worsen congestion. Our opposition will continue. Minister, can we publicly debate the project’s merits? The tunnel road is costing us the Red Line Metro expansion. The Veterinary College station has been dropped. How long will you keep changing alignments to accommodate the tunnel road and blame the Centre for delayed Metro approvals? Stop this charade,” said Surya.A people’s victory for Bengaluru!Minister Krishna Byre Gowda’s announcement to move the tunnel road out of Lalbagh is an initial victory for the citizens’ movement for scientific and sustainable urban development.1. I thank the thousands of responsible Bengalureans who responded to my call to protect Lalbagh’s heritage and oppose this unscientific and unnecessary project. This victory belongs to them.2. Changing the alignment does not make the project scientific. Experts from IISc and other institutions have warned that it will worsen congestion. Our opposition will continue. Minister, @krishnabgowda, can we publicly debate the project’s merits?3. The tunnel road is costing us Red Line Metro expansion. The Veterinary College station has been dropped. How long will you keep changing alignments to accommodate the tunnel road and blame the Centre for delayed Metro approvals? Stop this charade.4. The Hebbal short tunnel threatens 3.3 acres of Hebbal Lake. There cannot be one rule for parks and another for lakes. Both must be protected. Scrap this Short Tunnel project too.5. The Chief Minister identified integrated public transport and pedestrian infrastructure as lessons from Japan. Will he now learn these lessons and scrap the project or continue doing the exact opposite?We have saved Lalbagh. We will save Hebbal Lake too.We will fully support Metro, suburban rail, buses, pedestrian infrastructure and last-mile connectivity.Bengaluru needs to move more people, not more cars.Our fight for scientific and sustainable development will continue.— Tejasvi Surya (@Tejasvi_Surya) November 25, 2026https://platform.x.com/widgets.js“The Hebbal short tunnel threatens 3.3 acres of Hebbal Lake. There cannot be one rule for parks and another for lakes. Both must be protected. Scrap this project too. The Chief Minister identified integrated public transport and pedestrian infrastructure as lessons from Japan. Will he now learn these lessons and scrap the project or continue doing the exact opposite? We have saved Lalbagh. We will save Hebbal Lake too. We will support Metro, suburban rail, buses, pedestrian infrastructure and last-mile connectivity. Bengaluru needs to move more people, not more cars. Our fight for scientific and sustainable development will continue.”In June last year, the Karnataka cabinet approved the construction of two major tunnel road corridors in Bengaluru under the build-own-operate-transfer (BOOT) model, paving the way for toll-based road usage. One corridor runs from Esteem Mall near Hebbal to HSR Layout/Silk Board, while the other stretches from KR Pura to Mysuru Road, both slated for development through a global tendering process.Story continues below this adThe detailed project report for the twin-tube tunnel road between Hebbal and Silk Board Junction estimated a toll of Rs 330 for a 16.6-km stretch.According to bids opened by Bengaluru Smart Infrastructure Ltd, a special purpose vehicle set up by the Karnataka government in June last year, the Adani Group emerged as the lowest bidder, quoting Rs 22,267 crore against the government estimate of Rs 17,698 crore.