Background: Decisions about deploying large language model (LLM) agents in health care require the cost of completed work in production. Published evidence reports benchmark accuracy, benchmark-level cost, and time or financial outcomes for ambient documentation, and list prices alone do not determine the cost of completed work. To our knowledge, no deployed clinical agent fleet has published a measurement method that ties compute cost, latency, failures and retries to completed work. Objective: This study aims to estimate the compute cost of completed work by the orchestrated clinical agents of a deployed LLM agent fleet over a 12-week window of production telemetry, using estimators, data-quality gates and an analysis plan fixed before any window data are extracted for the study. Methods: The setting is a private outpatient clinic in London, United Kingdom, where wai, a multi-agent system supporting clinic operations, is deployed. The population is every run of the 20 orchestrated clinical documentation and decision-support agents starting between September 21 and December 13, 2026. The run store writes 2 records for every run, a non-terminal record before the model call and a terminal record after it, and has no attempt counter or parent-run link. Estimators defined on that structure cover cost per resolved execution and per completed intention, retry and failed-intention shares of compute, error and failure rates, latency, cost per draft offered for clinician review and a latency-cost frontier, by agent, task class and acceptance stratum. Cost is recorded in GBP pence, converted from provider-returned US dollar cost at a fixed rate and rounded per model call. The plan fixes weekly aggregation, small-cell suppression, bootstrap intervals over weeks, 2 prespecified comparisons, 5 sensitivity analyses and 4 data-quality gates whose failure converts an estimate into a bound or an unmeasured stratum. Two staff-level measures in an earlier version were dropped. Revenue, pricing, margin and staffing inference are excluded. Results: The measurement window opened on September 21, 2026, and closes on December 13, 2026, and telemetry is being recorded in routine operation. No window data had been extracted for this study at submission. Aggregate whole-table counts that include window records were extracted on November 19, 2026, for companion manuscripts and are disclosed. Extraction will begin no earlier than December 15, 2026, and the results are expected to be submitted for publication in 2027. Conclusions: The compute cost of completed clinical agent work can be specified as estimators over the run-level telemetry this deployment records, provided paired recording rows are separated from retries, missing terminal states are bounded and rounding of recorded cost is reported. This protocol fixes those estimators, and the reporting consequence of each known instrumentation defect, before extraction. Trial Registration: None. The analysis plan will be registered on Open Science Framework Registries before any window data are extracted for this study.